

Plumbing
Plumbing Demolition and Service Isolation Template (SWMS)
$66.00incl. GST
Delivered as a download link by email straight after payment.
✅ Product Description: Plumbing Demolition and Service Isolation SWMS
Identify services. Isolate positively. Demolish in sequence. Prevent uncontrolled release.
This SWMS for Plumbing Demolition and Service Isolation is designed to manage the high-risk hazards associated with shutting down, isolating, disconnecting and removing plumbing fixtures, pipework, equipment and redundant services.
With a strong focus on positive service identification, lockout, residual pressure, demolition sequencing, asbestos, falling material, temporary services and unexpected live connections, this template provides clear control measures for each stage of the work—helping your business meet its WHS obligations on Queensland worksites.
Suitable for licensed plumbers, demolition contractors, builders, mechanical-services contractors, maintenance teams and principal contractors, this SWMS is practical, detailed and ready for immediate use.
✅ What This SWMS Covers
- Planning the demolition scope and sequence
- Reviewing structural, demolition and service drawings
- Identifying water, sewer, gas, electricity, fire and communications services
- Checking asbestos and hazardous-material registers
- Coordinating shutdowns and temporary services
- Positive isolation, lockout, draining, venting and proving safe
- Independent isolation verification and authorisation to proceed
- Establishing exclusion zones and access controls
- Supporting and disconnecting fixtures, pipework and equipment
- Controlled cutting and removal in the approved sequence
- Protecting retained services and adjoining structures
- Removing penetrations, supports and redundant components
- Reinstating fire stopping, waterproofing and protective barriers
- Segregating and disposing of demolition waste
- Testing retained, capped and temporary services
- Emergency response, final inspection and handover
Includes a detailed, step-by-step task breakdown with initial and residual risk ratings, control measures and assigned responsibilities for practical site use.
✅ Compliance and Legislation
Aligned with relevant Queensland requirements and guidance, including:
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2011
- Plumbing and Drainage Act 2018
- Plumbing and Drainage Regulation 2019
- Electrical Safety Act 2002
- Electrical Safety Regulation 2026
- Construction Work Code of Practice 2021
- Demolition Work Code of Practice 2021
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- How to Manage and Control Asbestos in the Workplace Code of Practice 2021
- Electrical Safety Code of Practice 2021—Managing Electrical Risks in the Workplace
- First Aid in the Workplace Code of Practice 2021
- NCC 2022 Volume Three—Plumbing Code of Australia
Also includes requirements for demolition planning, licensed trade isolation, asbestos registers, shutdown permits, temporary services, waste disposal, inspection, testing and applicable Australian Standards.
✅ Key Features
- Strong focus on positive isolation and verification before demolition
- Covers residual pressure, hot water, contamination and stored energy
- Addresses demolition sequence, supports and falling materials
- Includes asbestos and hazardous-material stop-work controls
- Covers occupied premises, temporary services and public protection
- Includes waste segregation, testing and handover requirements
- Includes PPE, equipment, training and competency requirements
- Includes monitoring, authorisation, worker sign-off and revision sections
✅ Download Format
- Microsoft Word—editable for your business and job site
✅ Perfect For
- Licensed plumbers and plumbing contractors
- Demolition and strip-out contractors
- Builders and principal contractors
- Mechanical-services contractors
- Commercial refurbishment and maintenance teams
- Site supervisors and project managers
- WHS officers managing demolition, isolation and service-strike risks

