

SWMS
SWMS Pump Tank and Water Treatment Installation Template (SWMS)
$66.00incl. GST
Delivered as a download link by email straight after payment.
✅ Product Description: Pump, Tank and Water Treatment Installation SWMS
Lift safely. Control chemicals. Protect water quality. Commission correctly.
This SWMS for Pump, Tank and Water Treatment Installation is designed to manage the high-risk hazards associated with delivering, lifting, positioning and commissioning tanks, pumps, filters, pipework, electrical controls, instrumentation and chemical-dosing equipment.
With a strong focus on suspended loads, tank foundations, electrical isolation, hazardous chemicals, pressurised systems, falls, confined spaces and water-quality protection, this template provides clear control measures for every stage of the installation—helping your business meet its WHS obligations on Queensland worksites.
Suitable for plumbers, water-treatment contractors, mechanical and electrical contractors, tank installers, civil contractors, commissioning technicians and principal contractors, this SWMS is practical, detailed and ready for immediate use.
✅ What This SWMS Covers
- Planning and coordinating pump, tank and treatment-system installation
- Verifying process design, tank capacity, base engineering and permits
- Inspecting delivery routes, crane setup areas and existing services
- Preparing load-rated bases, bunding, drainage and safe access
- Delivery, unloading and inspection of pumps, tanks and components
- Lift planning, rigging, tag lines and suspended-load exclusion zones
- Positioning and anchoring tanks and treatment equipment
- Installing pipework, valves, supports, overflow and sampling points
- Installing pumps, couplings, guards and vibration controls
- Licensed electrical, control and instrumentation connections
- Emergency stops, alarms, interlocks and fail-safe systems
- Receiving, storing and connecting treatment chemicals
- Chemical compatibility, SDS, bunding, eyewash and spill response
- Filling, flushing, pressure testing and overflow prevention
- Dosing calibration, process commissioning and water-quality testing
- Emergency response, records, operating procedures and handover
Includes a detailed, step-by-step task breakdown with initial and residual risk ratings, control measures and assigned responsibilities for practical site use.
✅ Compliance and Legislation
Aligned with relevant Queensland requirements and guidance, including:
- Work Health and Safety Act 2011
- Work Health and Safety Regulation 2011
- Plumbing and Drainage Act 2018
- Plumbing and Drainage Regulation 2019
- Electrical Safety Act 2002
- Electrical Safety Regulation 2026
- Construction Work Code of Practice 2021
- How to Manage Work Health and Safety Risks Code of Practice 2021
- Managing Risks of Plant in the Workplace Code of Practice 2021
- Managing Risks of Hazardous Chemicals in the Workplace Code of Practice 2021
- Hazardous Manual Tasks Code of Practice 2021
- Managing the Risk of Falls at Workplaces Code of Practice 2021
- Confined Spaces Code of Practice 2021
- Electrical Safety Code of Practice 2021—Managing Electrical Risks in the Workplace
- First Aid in the Workplace Code of Practice 2021
- NCC 2022 Volume Three—Plumbing Code of Australia
Also includes requirements for approved engineering, lift plans, licensed plumbing and electrical work, chemical SDS, equipment calibration, commissioning records, water-quality criteria and applicable Australian Standards.
✅ Key Features
- Covers pumps, tanks, filters, controls and chemical-dosing equipment
- Strong focus on lifting, suspended loads and tank-base stability
- Addresses hazardous chemicals, bunding, spill response and eyewash
- Covers electrical isolation, alarms, interlocks and unexpected start-up
- Includes pressure testing, commissioning and water-quality verification
- Clearly prohibits tank entry without a separate confined-space system
- Includes PPE, equipment, training and competency requirements
- Includes monitoring, authorisation, worker sign-off and revision sections
✅ Download Format
- Microsoft Word—editable for your business and job site
✅ Perfect For
- Water-treatment and pump contractors
- Licensed plumbers and electricians
- Tank installers and mechanical-services contractors
- Civil contractors and principal contractors
- Commissioning and instrumentation technicians
- Councils, utilities and facility operators
- Site supervisors and project managers
- WHS officers managing lifting, chemical and water-treatment risks


