TWC Total Workplace Compliance
Trenching & Excavation SWMS Template – Safe Work Method Statement

Plant and Equipment

Trenching & Excavation SWMS Template – Safe Work Method Statement

$66.00incl. GST

View cart

Delivered as a download link by email straight after payment.

Trenching & Excavation SWMS – Safe Work Method Statement Template (WHS Compliant)

When you’re digging deep, your paperwork needs to be rock solid. This editable Safe Work Method Statement (SWMS) for Trenching and Excavation work is your go-to for keeping site safety tight and WHS obligations sorted.

Covers critical risks like trench collapse, shoring, battering, underground services, silica dust exposure, and mobile plant operation. Whether you’re doing sewer installs, site prep or footing work — this SWMS helps you stay on the level.

✔ Fully compliant with Australian WHS requirements
✔ Designed for real job sites — practical, not just paperwork
✔ Covers deep trenching, operator protection, spoil management and inspection protocols
✔ Built in line with WHS Act 2011, Excavation Work Code of Practice 2021, and Managing the Risk of Falls Code of Practice 2021

✅ Key Features:

  • Shoring, benching and battering guidance
  • Covers underground service checks and pre-start inspections
  • Risk controls for trench collapses and plant operation
  • Site fencing, spoil management and hazard zoning procedures
  • Step-by-step job breakdown with hazards and controls

✅ Download Format:

  • Microsoft Word (editable format)
  • PDF (locked version for job files or subcontractors)

✅ Perfect For:

  • Civil contractors and earthmoving teams
  • Construction crews and site supervisors
  • WHS officers and safety consultants
  • Tender documentation and safety compliance audits

More in Plant and Equipment