

Other
Working at Heights SWMS Template – Safe Work Method Statement
$66.00incl. GST
Delivered as a download link by email straight after payment.
✅ Product Description: Working at Heights SWMS (2025)
Working at Heights SWMS – Safe Work Method Statement Template (WHS Compliant) Make sure your team stays safe above ground level with this practical, editable Safe Work Method Statement (SWMS) for Working at Heights tasks. From ladders and scaffolds to rooftops and elevated platforms, this document provides detailed risk control measures for fall hazards and high-risk site activity.
This SWMS is fully aligned with Australian WHS legislation and Codes of Practice — perfect for trades, construction teams, maintenance crews and compliance consultants.
✔ Fully editable and ready to use on-site
✔ Covers fall arrest systems, ladders, manual handling and more
✔ Suitable for residential, commercial and industrial projects
✔ Meets WHS Act 2011, WHS Regulation 2011, and Code of Practice 2021 – Managing the Risk of Falls
✅ Key Features:
- Fall prevention systems (harnesses, anchor points, static lines)
- Ladder safety protocols and pre-start inspections
- Site access control and exclusion zones
- Covers both indoor and outdoor elevated work
- Toolbox talk–friendly layout
✅ Download Format:
- Microsoft Word (editable template)
- PDF (locked version for use on-site or with subcontractors)
✅ Perfect For:
- Builders and roofers
- Construction contractors and site managers
- Maintenance and facility teams
- Safety and compliance professionals


